Saturday 30 September 2017

MY NEW BEACH HOUSE BATHROOM

We now have running hot and cold water and ........... a flushing toilet. I'm happy!!  The new bathroom in the beach house is coming together much faster now.  It's always the things that don't show (like the plumbing & electrical) that take all the time. 

I've painted the walls in certain areas and the toilet is in.

 
The vanity is installed and the medicine cabinet is hung. 







The final thing we just did was to build that missing wall where the old bathroom door used too be.  It was not exactly a private facility with that gaping hole.  Once the water was hooked up and the toilet was in, that was next on my list, and Dan, tired of hearing about it, was teasing me saying "Now you're just being spoiled.  You sound like Donald Trump.  I want a wall, build me a wall."  LOL
 

Tomorrow I will start staining and varnishing both the doors to the bathroom.  


 We still have the big tiling job to do in the shower stall.  And, the shower door to hang.  We should manage to finish that in the next week or so.  


IT'S GETTING THERE.