Saturday, 7 June 2014

THIS SPRING PROJECT IS COMING ALONG

The spring project at our daughters is coming along.  The demolition has been completed and the rebuild has started.
 

This project consists of 3 main areas.  Opening up the wall between the dining room and kitchen, creating a pony wall for a new pass through counter, new granite counter tops and widening the doorway.  This also required repairs to the new laminate floors where the door was widened. 
 

Then there is the bathroom, that needs a major plumbing repair then replace the old tub surround with new subway tiles around the tub. 
 

And finally, the back entry is getting a whole new ceiling now that the new roof has eliminated the leaking.  Plus of course there are always the "Might as wells" that get added to the list, when you have an old house, like new plumbing fixtures while you have the shower all pulled apart and finally getting rid of the last of the old post and spool wiring while you're at it. 
 
 
Now that the supplies are here and unloaded we are done for now.   
 
 
 
 
All of this certainly won't be finished this spring, but it's time for us to get on with our boat projects.  So, carry on, and let us know if you run into any snags.  And we will come back and lend a hand in the fall. 
 
 
 